Storm water western Ring Road project , 51.16 KM of pipeline & Box Culvert , Diameters of 800-2500mm in the neighborhood of Buraydah
Support & renewing of 24 km of potable water network with various diameters, 1400 mm, 2000mm. The project includes 800 Linear Meters of Micro Tunneling for the casing pipe diameter of 2500mm.
59 KM of GRP water transmission pipelines of various diameters to cater water requirement to the east village of Hofuf.
Execution of 96 KM pipeline and Box culvert with various diameters 400 -1200 mm for Flood and storm water drainage network in Nadeem and Janadriyah area.
A project for the execution of separate networks and water lines in the Al-Aarid district of Riyadh (phase 131) with various pipe diameters.
Construction of 26 KM of storm water network Box Culvert in Al Shifa Area of Riyadh.
The water treatment plant was constructed on Targis Dam to supply potable water to 200,000 residents of Al Namas city.Targis Water Treatment Plant project consists of civil works, tanks, reverse osmosis units (R.O), SCADA system and electro mechanical works.
Upgradation of Arar water treatment plant from the exiting capacity of 25000 m3 / day to 75,000 m3 / day in the northern border region, The project owner is Ministry of Environment, Water and Agriculture , The project includes the construction of a WTP with a total capacity of 75,000 M3 / day, including Civil works, buildings, etc. with a reverse osmosis system, raw water tank, purifier, sprinklers, filters, , evaporation pounds and installation of 50KM pipeline to collect water from the wells to the station and reservoirs for the purpose of supplying to Arar governorate and its centers.
Relocation of 1350 linear meters of main sewage line in the north of Riyadh, The project was executed by NDRC method of construction using Micro tunneling machine with diameters of 1000mm.
4700 linear meters main sewage line in the busiest Olaya area in Riyadh, The project was executed by NDRC method of construction using Micro tunneling machines with diameters of 1400mm and 1600mm. The project consisted of 420 linear meters of a single crossing by NDRC method.
The project was executed by NDRC method of construction using Micro Tunneling machine for the diameters of 1600mm RCJ pipes with a length of 2600 Linear Meters.
Construction of 40,000 m³ concrete ground water reservoir on Al Samara mountain and 8 KM of water distribution line to supply water in Hail City.
Extension of 15 KM of water network & Elevated tank in Hail
Construction of 140 KM Sewage Network Project With House Connections.
Construction of 38 km water transmission line in Hail Al shamel-1, of various diameters.
Upgradation of Reversed Osmosis Water treatment plant (phase 1) with 36KM of transmission lines in Rafha
Execution of separate networks and water lines in Al-Narges area , Riyadh, stage 129.
Execution of the remaining sewage networks in parts of Al-Hazm and Al-Rafeia area in Riyadh.
Operation & Maintenance of sewage treatment plant in Medina al Munawarah.
Operation and Maintenance of water treatment plant Riyadh Al Khabara.
Operation and Maintenance of Hail Sewage Treatment Plant and Network.
Operation and Maintenance of networks and sites of floods in the city of Buraydah Al-Qassim (DOWN STREAM).
Operation and Maintenance of Pump stations and sewage treatment plant.
Operation & Maintenance of sewage treatment plant in Khamismashyat.
Operation & Maintenance of water networks.
Operation & Maintenance of water treatment plant GROUP 1
Operation & Maintenance of water treatment plant GROUP II
Operation & Maintenance of water treatment plant in Bosiatha.